Pinterest • The world’s catalogue of ideas

Explore Concrete Stair, Academy Dundee and more!

Concrete stair core under construction.

Concrete stair core under construction.

Erecting formwork to the stair core

Erecting formwork to the stair core

10. The clocktower is down safely

10. The clocktower is down safely

underfloor heating - http://www.heatthat.co.uk/electric-underfloor-heating/electric-underfloor-heating-150.html

underfloor heating - http://www.heatthat.co.uk/electric-underfloor-heating/electric-underfloor-heating-150.html

8. The clocktower, readied for removal

8. The clocktower, readied for removal

hydronic radiant heating.  it would be so nice to walk on a warm and cozy cork floor with this underneath it.  it's expensive up front, but pays back in about 7 years from the energy savings.

hydronic radiant heating. it would be so nice to walk on a warm and cozy cork floor with this underneath it. it's expensive up front, but pays back in about 7 years from the energy savings.

Raising the levels of the existing site

Raising the levels of the existing site

The West Wing continues upwards.

The West Wing continues upwards.

Past and present at the Harris Academy site

Past and present at the Harris Academy site

Retaining wall formwork is progressing

Retaining wall formwork is progressing

An early start on site and a spectacular sunrise...

An early start on site and a spectacular sunrise...

Tower crane 2 being assembled.

Tower crane 2 being assembled.

7. The last section of the 1930s building under demolition

7. The last section of the 1930s building under demolition

1. High-reach machine demolishing the 1960s building

1. High-reach machine demolishing the 1960s building

Let's see what's through the square window...

Let's see what's through the square window...