Hampton Inn & Suites    |    new construction A design / build method was used to deliver this 146-room new hotel project, which was designed and constructed simultaneously with a Cambria Suites Hotel, both located on the same site. During design, Stahl suggested that pre-cast concrete be used rather than post-tension methods. By using pre-cast, construction was able to continue through the winter months, saving the owner time and money.

Hyatt Place    |    new construction Stahl was the design / builder for this 136-room, four-story hotel totaling 97,000 SF. In addition, 94% of all construction waste was recycled, 20% of the building materials came from within a 500-mile radius of the project site, and actions to reduce construction pollution were taken by controlling soil erosion, waterway sedimentation, and dust generation. Winner of the Hyatt North America Best Project Award, and Building of America Network…

TownePlace Suites | new construction Stahl was hired as the general contractor for two new TownePlace Suites projects: 94 units and 106 units. Amenities at each include an outdoor pool, exercise facilities, a laundry center, and administrative offices. Each project was designed as an extended-stay facility, and features apartment-like designs.

Cambria Suites | new construction This is the first of Choice Hotels' new Cambria Suites design to be developed in Minnesota. It is located near the airport and Mall of America; has 113 rooms; sits on a 4-acre site; and features a more stylish, contemporary atmosphere for business travelers and families alike.

Residence Inn by Marriott | new construction Stahl was the design / builder for this 124-room, four-story hotel totaling 88,000 SF. Keeping sustainability top of mind during construction, a number of “green” practices were implemented; 94% of all construction waste were recycled, diverting it from landfills, 20% of the building materials came from within a 500 mile radius of the project site, therefore reducing the amount of fuel needed for material deliveries.

Residence Inn-Milwaukee Depot | new construction Originally scheduled to open on April 28, Stahl completed the 130-room Residence Inn project 30 days early in time to receive guests for a large event. Amenities include an ornate entrance lobby, hearth room, billiard room, and fireplace suites.

Village at St. Anthony Falls | new construction This was the first project of its kind in the Minneapolis St. Anthony neighborhood since the 1980s. Stahl demolished the former car dealership and built a three-story building with 13,000 SF of retail space on the street level and 32 apartments above. Stahl also renovated the historic 1902 Fire Barn and its annex into 30,000 SF of commercial office space and added a 215-space parking ramp to the south of the retail and apartment…

SpringHill Suites | new construction Stahl was hired as the general contractor for two new SpringHill Suites projects: 118 rooms and 126 rooms. Amenities at each include an outdoor pool, exercise facilities, a laundry center, and administrative offices. Each project was designed as an extended-stay facility, and features apartment-like room designs.

AmericInn | new construction Stahl, as a construction manager, has completed a total of three AmericInn projects located in Peoria, IL; Sidney, NE; Stuart, IA. Each project includes an indoor pool, extended stay suites with kitchenettes, large executive meeting rooms, and a hospitality suite.